9. Turn the ON/OFF switch to the ON position.
After five minutes, the inverter starts to produce power into the AC grid if all
necessary operating conditions are met.
ON/OFF switch
DC disconnect in Power ON position
AC disconnect in Power ON position
4597
Figure 5‑2. Inverter with AC and DC disconnect power ON
If the unit fails to power on, use the troubleshooting information provided in
this manual. If those steps do not resolve the problem, contact your service
provider or AE Solar Energy Technical Support.
INVERTER OPERATING STATES
The PVP250kW/PVP260kW inverter has nine operating states. The inverter will
transition from one state to another only as shown in the following figure. Each
operating state is described below.
Advanced Energy
5‑2 Operation 570-1001792-05A